40,000 sf warehouse – split into two 20,000 sf warehouses with 25′ eaves.
2 – 5,000 sf offices with mezzanines
Construction is colored split faced CMU with a pre-engineered building.
The North tenent space has a two door loading dock. The South tenant space is prepped for a loading dock.
All utilities have been independently installed and metered to separate the North and South ends. Gas, Water, Fire Protection, Electrical, Fire Alarm System, etc. The entire Building is fire sprinkled
Foundations started the end of July and the building was occupied in Mid-December.