Beaumont Health System 5th Floor West Bed Tower Oncology Hospice Patient Care

This new 44 bed Oncology/Hospice unit occupies the entire 44,000 SF of the 5th floor West Bed Tower at Beaumont’s Troy Campus. Special attention was given to the fourth floor areas below the new hospice suites, with regards to planning and scheduling all work in these active areas with hospital mangement and fourth floor departmental staff. The goal was to eliminate disruptions to patient care and comfort.Continual management of Beaumont’s Interim Life Safety Plan and Epidemiology Control Plan ensure that patient risk was minimized. All utility work, shut downs and change overs were scheduled at times that presented the least possible interruption to hospital operations. All work was completed within a five month duration employing a schedule that managed three simultaineously executed phases of construction.

 

Project Location:

Troy Campus
Troy, MI

Size:

44,000 SF
Building Area

Use:

Oncology/Hospice Suites
Central Nurse POD
Nourishment Stations
Central Lobby
Visitor Lounge
Family Center/Break Area
Staff Support Office
Sterile/Soiled Linen Storage

Owner:

Beaumont Health System
Troy, MI

Architect:

Harley Ellis Devereaux Southfield, MI